Dams and Water Resources Engineering

Surveying laboratory

In this laboratory several survey instruments were introduced to the students such as (Level, Planimeter, typical and digital Theodolite). During the lecture (Semester) many practices are done at the site using the survey instruments.

  •   Principal for construction the perpendicular lines
  •   Linear measurement
  •   Introducing to leveling
  •   Serious leveling
  •   Closed differential leveling
  •   Profile leveling
  •   Cross sections
  •   Contour lines (Maps)
  •   Planimeter
  •   Typical Theodolite
  •   Electronic digital theodolite
  •   Traverse
  •  

     

     

     

    Department of Dams and Water Resources Engineering at the Engineering College - University of Salahaddin-Erbil